USC Schedule of Classes

Fall 2017

Civil Engineering 408:

Risk Analysis in Civil Engineering (3.0 units)

Realization of nondeterministic problems in civil engineering; quantitative analysis of structural and system reliability; optimal design and design with specified risk.
SectionSessionTypeTimeDaysRegisteredInstructorLocationSyllabusInfo
29655R001Lecture2:00-3:20pmTue, Thu48 of 55Roger GhanemTHH114session dates
29653R001Discussion3:30-4:20pmThursday31 of 36MHPB7Bsession dates
29654R001Discussion5:00-5:50pmTuesday17 of 35GFS207session dates
Information accurate as of March 4, 2018 4:29 pm.